Showing posts with label totals 2014. Show all posts
Showing posts with label totals 2014. Show all posts

Wednesday, June 25, 2014

Totals for June 2014


This birdhouse quilt for a customer was my custom quilt this month... made by the sister of the donkey quiltmaker.  This was a bit quicker finish than last month's donkeys...  I guess the more of these types of quilts I do the easier and quicker they finish.  There was some stitch-in-ditch (SID), outlining of shapes and then a small stipple meander for background fill-in.  

I have three more custom quilts to work on this summer... the third one being another donkey quilt!  The two sisters make the same pattern together (although one is a bit faster at completing than the other).  I won't be getting the second birdhouse quilt though... she decided to make one block at a time and quilted it on her DSM before assembling into a quilt.  Not to fear... they have other projects in the making for me to quilt for them!

My dancing 9patch for my great niece is now quilted and bound and ready for delivery.
I quilted and bound the pink squares babyquilt that I started to sew along with Peggy while she made her first quilt for her granddaughter.
I pulled out 6 red/blue placemats I made last fall and got the binding done on them.  
I also pulled out a quilt-as-you-go tablerunner kit that I purchased at an FCE craft camp and stitched and bound that.  I'd never done quilt as you go before.  It's a good option for those that don't have a longarm... but I prefer to quilt on my longarm :)

I am working on organizing a bunch of UFOs to take on vacation in hopes of completing at least a few of them.  I think I've found 10 so far! 

After vacation I'll get back to working on my Celtic Solstice and I think I may use Talkin Turkey as a leader/ender for that one.  Hopefully I'll get at least one of them assembled into a flimsy before Bonnie's next mystery in November.

WORK COMPLETED IN June 2014
 ....03....customer tops quilted (YTD  30)
.....02.....customer quilts bound (YTD  8 )
.....00.....flimsy completed waiting for quilting (YTD )
......02.......quilted flimsy (YTD 4... OB, Owls, pink squares, dancing 9)
.....15.....hand-work hours (85TD )

Bonnie Projects in Progress

............... Celtic Solstice Step 1 blue triangles cut( 350 of 380 pairs)
............... Celtic Solstice Step 1 white and orange star points cut (380 of 380)
..............  Celtic Solstice Step 1 orange star point units sewed (50 of 140)
............... Celtic Solstice Step 1 white star point units sewed (100 of 240)

.....00.....cheddar bowties blocks hand-pieced (YTD  6  of  81in 2013)   ...  (81 of 162 in 2012)
.....00.....cheddar bowtie rows stitched (YTD  0 .... 9 of 18 in 2012)
.............. Talkin Turkey..... 2 blocks complete plus parts
.............. Midnight Flight....1 block complete plus parts
.............. Winston Ways... 2 blocks complete plus parts


UFOs – WIPs
2006 Barn Blocks
2009 1950s Santa
2009 Sunbonnet sue …prairie point borders
2010 Swartz Creek Quilt
2010 Vicksburg BOM 
2011 Cheddar Bowties 
2011 Happiness Key
2011 Novelty Quilt (pat sloan)
2011 Dear Jane/Hot Momma Rose
2012 Basic Class Wall Hanging…. Borders, quilting
2012 Winston Ways
2012 Turkey Tracks
2012 Midnight Flight 
2012 Pillow Cover …assembly
2012 Red/White D4P…assembly
2013 Daisy placemats/runner (sept)…. needs binding
2013 Florals & 9Patch (aug)
2013 Maddie Bea Sweet & Sassy (becky’s barn)
2013 Spring Wall Hanging (WSS project)
2013 Becky’s Barn Basket wall hanging… borders, quilting
2013 Celtic Solstice (nov)
2014 Cracker Barrel - Blue/White strip quilt (jan)… L/E for CS


Waiting to be Quilted
2006 Rosewood Cottage.. quilting by hand
2007Monkey Wrench BOM ...for sale

2014 Completed Projects
march..Orca Bay (started nov 2012)
June....Pink baby squares (started may 2014)
june....Dancing 9 (started march 2014)
june....blue floral placemats (started sept 2013)

Sunday, June 8, 2014

2014 Totals - May

This month I made a new quilty friend... teaching her how to make a quilt for her granddaughter from baby clothing. 

 

I worked on a pink squares baby quilt along side her to give her confidence and reduce my stash a bit.


It took me quite a bit of time, but I finished my first custom quilt of the year... donkeys!  Lots of stitch-in-ditch and free motion background quilting.  3 more customs to go!


I made progress on my Dancing 9 and it is now a flimsy ready to load on the quilter. I hope my new great niece will love it!


I worked on Cracker Barrel as an L/E ... all of the white triangles are attached. Now I need to cut the blues to sew on the opposite sides.  I'm ready to get back to working on my Celtic Solstice again.

I did some studio cleaning and organizing as well as household organizing with help from my grandson.  Now most of his toys have a place to be :)

Last but not least, I did work on my Spring Wall Hanging and have all the flowers stitched down.  Next.... the leaves! (I thought I had a picture but can't find it right now... will post one later)


WORK COMPLETED IN May 2014
 ....05....customer tops quilted (YTD  27)
.....01.....customer quilts bound (YTD  6)
.....00.....flimsy completed waiting for quilting (YTD )
......00.......quilted flimsy (YTD 2... OB, Owls)
.....10.....hand-work hours (70TD )

Bonnie Projects in Progress

....done..Orca Bay
............... Celtic Solstice Step 1 blue triangles cut( 350 of 380 pairs)
............... Celtic Solstice Step 1 white and orange star points cut (380 of 380)
..............  Celtic Solstice Step 1 orange star point units sewed (50 of 140)
............... Celtic Solstice Step 1 white star point units sewed (100 of 240)
..flimsy..... Dancing 9s  9patches made (YTD 64 of 64)

.....00.....cheddar bowties blocks hand-pieced (YTD  6  of  81in 2013)   ...  (81 of 162 in 2012)
.....00.....cheddar bowtie rows stitched (YTD  0 .... 9 of 18 in 2012)
.............. Talkin Turkey..... 2 blocks complete plus parts
.............. Midnight Flight....1 block complete plus parts
.............. Winston Ways... 2 blocks complete plus parts


UFOs – WIPs
2006 Barn Blocks
2009 1950s Santa
2009 Sunbonnet sue …prairie point borders
2010 Swartz Creek Quilt
2010 Vicksburg BOM 
2011 Cheddar Bowties 
2011 Happiness Key
2011 Novelty Quilt (pat sloan)
2011 Dear Jane/Hot Momma Rose
2012 Basic Class Wall Hanging…. Borders, quilting
2012 Winston Ways
2012 Turkey Tracks
2012 Midnight Flight 
2012 Pillow Cover …assembly
2012 Red/White D4P…assembly
2013 Daisy placemats/runner (sept)…. needs binding
2013 Red blue floral placemats (sept)…. Needs binding
2013 Florals & 9Patch (aug)
2013 Maddie Bea Sweet & Sassy (becky’s barn)
2013 Spring Wall Hanging (WSS project)
2013 Becky’s Barn Basket wall hanging… borders, quilting
2013 Celtic Solstice (nov)
2014 Cracker Barrel - Blue/White strip quilt (jan)… L/E for CS


Waiting to be Quilted
Rosewood Cottage (since 2006) quilting by hand
Monkey Wrench BOM (since 2007) for sale
Pink baby squares
Dancing 9

Wednesday, April 23, 2014

Totals 2014 - March

Ok, I am definitely late with this, but life has been busy and I have been mostly offline lately in order to keep up.  I'll catch up with several different posts on what's been happening, but for now I am just going to update my work progress

I completed the quilting on my Orca Bay just in time to take to Oliver Springs, TN to show at class with Bonnie early in March.  I now have the binding on and just need to add a label.  The class was Dancing 9s... the baby quilt she made for her two nephews.  Mine will be shades of pink/orange/lavender... what I call sunset colors... and will be given to my brand new grand-niece when complete.  As of today I have enough blocks  assembled for the first two rows and must cut up more strips to continue progress.

I have agreed to help encourage a friend by starting and working on a new quilt together.   Make It Your Way    I'm not sure if this link will work, but you can copy/paste to see the pattern and directions.  

http://www.mccallsquilting.com/MakeItYourWay

I am trying to stick with clearing things out and using my stash, so I chose 8 goodwill shirts in green and blue.  I did supplement with 4 yards of cream fabric with either blue or green tiny dots on it.  This will make a nice low volume quilt. 



WORK COMPLETED IN January-February 2014
 ....07.....customer tops quilted (YTD  15)
.....01.....customer quilts bound (YTD  4)
.....00.....flimsy completed waiting for quilting (YTD )
......01.......quilted flimsy (YTD 1 )
.....10.....hand-work hours (50TD )

Bonnie Projects in Progress

....done..Orca Bay
............... Celtic Solstice Step 1 blue triangles cut( 350 of 380 pairs)
............... Celtic Solstice Step 1 white and orange star points cut (380 of 380)
..............  Celtic Solstice Step 1 orange star point units sewed (50 of 140)
............... Celtic Solstice Step 1 white star point units sewed (100 of 240)
......24..... Dancing 9s  9patch blocks made (YTD 24)

.....00.....cheddar bowties blocks hand-pieced (YTD  6  of  81in 2013)   ...  (81 of 162 in 2012)
.....00.....cheddar bowtie rows stitched (YTD  0 .... 9 of 18 in 2012)
.............. Talkin Turkey..... 2 blocks complete plus parts
.............. Midnight Flight....1 block complete plus parts
.............. Winston Ways... 2 blocks complete plus parts


UFOs – WIPs
2006 Barn Blocks
2009 1950s Santa
2009 Sunbonnet sue …prairie point borders
2010 Swartz Creek Quilt
2010 Vicksburg BOM 
2011 Cheddar Bowties 
2011 Happiness Key
2011 Novelty Quilt (pat sloan)
2011 Dear Jane/Hot Momma Rose
2012 Basic Class Wall Hanging…. Borders, quilting
2012 Winston Ways
2012 Turkey Tracks
2012 Midnight Flight 
2012 Pillow Cover …assembly
2012 Red/White D4P…assembly
2013 Daisy placemats/runner (sept)…. needs binding
2013 Red blue floral placemats (sept)…. Needs binding
2013 Florals & 9Patch (aug)
2013 Maddie Bea Sweet & Sassy (becky’s barn)
2013 Spring Wall Hanging (WSS project)
2013 Becky’s Barn Basket wall hanging… borders, quilting
2013 Celtic Solstice (nov)
2014 Cracker Barrel - Blue/White strip quilt (jan)… L/E for CS


Waiting to be Quilted
Rosewood Cottage (since 2006) quilting by hand
Monkey Wrench BOM (since 2007) for sale
2 blue placemats (R taylor)

Wednesday, March 5, 2014

2014 UFO Listing and Totals

This morning I realized I have not been keeping up with my blog lately. It is already March and I haven't even posted my UFO list or my totals list.  The polar vortex has thrown my schedule into a tizzy!  Icey roads, some snow and the extreme cold weather has kept me busy with caring for my grandson due to school closures.  And now, this week began Spring Break!  Since he has been with me more than in school with his friends, I paid for daycare for him for the two week break so that I could get a rest and have some time to myself.

I was able to finish up all my customer quilts; working in short spurts around entertaining the grandson and working into the night.  I have made progress on my personal quilting projects too. 

Much of my handwork hours have been spent de-boning and cutting up shirts for Celtic Solstice.  I have also just finished de-boning an additional 22 shirts in shades of pink-orange-purple for a Dancing 9s class that I will be taking with Bonnie on March 16th.  I intend this quilt to be a gift for my new grand-niece!


I have also worked on my Spring Wall Hanging and have all of the daffodils and tulips blanket-stitched on.  I am currently working on the hyacinths.

I have also begun a project of making monthly ornaments to fill my Christmas tree next year... so far I have made red/white Bow-ties and mittens and am working on hearts next.

I struggled at first, but once I discovered my coordination and slowed my pace just a bit I began to enjoy sewing on my treadle.  I am barely half done with Step 1 of Celtic Solstice, but having slowed down, I find my piecing is more accurate and I am really having fun!  My poor electric Singer is gathering dust!

I have finally moved Orca Bay to flimsy status...almost. I have decided to add an extra solid black border to frame it.   I am rushing to make a pieced backing with the remaining fabrics and get it quilted in time to share with Bonnie during the show and tell portion of class.

Silly me, I started a blue/white strip quilt (Cracker Barrel) to use as a leader/ender as I worked on piecing my Celtic Solstice. What was I thinking!  I have plenty of UFOs that I could have used... but no, I just had to start one more project! 

WORK COMPLETED IN January-February 2014
 ....08.....customer tops quilted (YTD  8)
.....03.....customer quilts bound (YTD  3)
.....00.....flimsy completed waiting for quilting (YTD )
.............quilted flimsy (YTD  )
.....40.....hand-work hours (40 YTD )

Bonnie Projects in Progress

....done..Orca Bay
...............Orca Bay piece backing, quilting


.....350.... Celtic Solstice Step 1 blue triangles cut( 350 of 380 pairs)
.....380.... Celtic Solstice Step 1 white and orange star points cut (380 of 380)
.......50...  Celtic Solstice Step 1 orange star point units sewed (50 of 140)
....100.... Celtic Solstice Step 1 white star point units sewed (100 of 240)

.....00.....cheddar bowties blocks hand-pieced (YTD  6  of  81in 2013)   ...  (81 of 162 in 2012)
.....00.....cheddar bowtie rows stitched (YTD  0 .... 9 of 18 in 2012)
.............. Talkin Turkey..... 2 blocks complete plus parts
.............. Midnight Flight....1 block complete plus parts
.............. Winston Ways... 2 blocks complete plus parts


UFOs – WIPs
2006 Barn Blocks
2009 1950s Santa
2009 Sunbonnet sue …prairie point borders
2010 Swartz Creek Quilt
2010 Vicksburg BOM 
2011 Cheddar Bowties 
2011 Happiness Key
2011 Novelty Quilt (pat sloan)
2011 Dear Jane/Hot Momma Rose

2012 Basic Class Wall Hanging…. Borders, quilting
2012 Winston Ways
2012 Turkey Tracks
2012 Midnight Flight 
2012 Orca Bay… borders, quilting
2012 Pillow Cover …assembly
2012 Red/White D4P…assembly
2013 Daisy placemats/runner (sept)…. needs binding
2013 Red blue floral placemats (sept)…. Needs binding
2013 Florals & 9Patch (aug)
2013 Maddie Bea Sweet & Sassy (becky’s barn)
2013 Spring Wall Hanging (WSS project)
2013 Becky’s Barn Basket wall hanging… borders, quilting
2013 Celtic Solstice (nov)
2014 Cracker Barrel - Blue/White strip quilt (jan)… L/E for CS
2014 Dancing 9s

Waiting to be Quilted
Rosewood Cottage (since 2006) quilting by hand
Monkey Wrench BOM (since 2007) for sale
2 blue placemats (R taylor)