Friday, June 21, 2013

Lakeside Get-away


Last week we escaped for a week to a rented lakeside cabin in the mountains of East Tennessee.   Once off the highway we left all of life's stresses behind... as well as cell phone reception!  I drove up into the mountains on roads that were, at times, so curvey the 25mph squiggle signs didn't do them justice.  Often times I couldn't see what was around the bend.  The area borders on the Cherokee National Park and the views as we climbed were gorgeous!


 


Our first stop was to unload and launch the boat where the guys could then cruise across the lake to our cabin.
  I set up my sewing machine by the sliding glass doors with a view of the lake off the covered porch.  The weather was beautiful most of the week and I was able to slide open the screen door and listen to the birds and get the fresh air without all the bugs! 





The early morning view with the "smoke" rising off the lake and mountains was phenomenal!
 




I worked on several projects throughout the week... 
         
First... and most important to him... was Matthew's Puppy quilt.  He spent the past 8 months embroidering these puppies and I promised to help him get it assembled into a top and quilted to enter into the county fair in August.  I've got a white with black dots for the backing to match the white dots on the blue sashing and red cornerstones (I'll have to try for a much better picture later).



I thought I brought along fabric and parts (HSTs) for Orca Bay Step 5, but all I had was the fabric.  So I cut the 350 triangles...and the sewing will have to wait until I find time at home.

I did bring along my Easy Street fabric and parts.  I had the square-in-square pieced borders almost ready to attach to the center, and a few extra pieces to fill in the corners.  I was pleasantly surprised at how easily it all fitted together...there was minimal tugging or easing to fit.  I love how it turned out! 

 
















 
After adding the final border, I forgot to take a picture out on the porch deck.  Now that I'm home, my floor space isn't big enough to lay it out, and it's raining outside today, but here is a picture of one corner showing all the borders.


There was only one day that the weather didn't cooperate, so we went for a long drive and ended up in Elizabethtown where we did  some grocery shopping and enjoyed a nice steak dinner out to celebrate Father's Day.  

I also stopped and picked up some fabrics to work with.  Back at the cabin I cut and stitched some pinwheel blocks but wasn't happy with the results.  I think the pinwheels are too strong and overwhelm the floral print.   Plan B is to make 9-patches using some white on white and the matching green I was going to use for the backing and use the pink and blue as the center square... hoping it will all play together better.

The water was a bit on the chilly side for me, but that didn't stop Matthew from going for a swim.



  
The fishing wasn't exceptional, but we did catch a couple of bass... enough for dinner one night.




This guy came swimming by nightly looking for bread scraps.  He and three others were brought to the area when a gentleman from Florida relocated nearby several years ago.  His companions are gone and he refuses to stay in the pond he was relocated to.  So the locals and tourists feed and take care of him.

It was a very relaxing and much needed vacation.  


Tuesday, June 11, 2013

Totals 2013 May


The biggest and best accomplishment for the month of May was being there for my daughter and the birth of my second grandson.  Everything went better than expected and all are well.  I completed quilts for both the new baby and big brother... just in time!
I also helped her finish up the necessary sweat-equity hours with Habitat for Humanity and she will be closing on her new home in June.

My second nephew graduated high school last weekend in Baltimore.  The next day, the family drove over to Gettysburg to visit Pop's grave and see the stone in place.  The three grandsons presented a cross to the parish that my brother had made.  The cut squares on the cross depict the stations of the cross.  Father was so pleased to receive it and felt it would be perfect to carry during the stations ceremony next Lent/Easter!




 WORK COMPLETED IN MAY
 .....05.....customer tops quilted (YTD 33)
.....01.....customer quilts bound (YTD  09)
.....01.....flimsy completed waiting for quilting (florabunda)
.....00.....quilted flimsy (YTD 9 )
.....08.....hand-work hours (62 YTD )

MY PROJECTS COMPLETED THIS YEAR:
Lucky Charms wall hanging (1/21/13)
Basket Sampler Welcome wall hanging (2/15/13)
Knitted afghan  (3/20/13)
Scrap Mania quilt (3/19/13)
Orange/Blue Jelly Roll quilt (3/18/13)
Hope Academy Banner (3/27/13)
Jaxson's quilt (3/22/13)
Baltimore Album (4/5/13)
Civil War Snowball (4/5/13)
Big Brother Quilt (5/7/13)

Projects in Progress 
  Spring Wall Hanging....backing prepared.  preparing flowers for applique
  Sweet & Sassy.....9 blocks completed, sashed and quilt corner assembled
  Assemble Matthew's Puppies... blocks complete, needs sashing/assembly
  Novelty Quilt... blocks cut, need assembly
  Happiness Key...background complete, needs applique/embroidery
  Disappearing 4 patch

Bonnie Projects in Progress
.....01.....cheddar bowties blocks hand-pieced (YTD  1  of  81)   ...  (81 of 162 in 2012)
.....00.....cheddar bowtie rows stitched (YTD  0 .... 9 of 18 in 2012)
.....49.....Orca Bay Step 1 hourglass blocks made (YTD 49  plus 21 in 2012) total  70 of 112 
....done...Orca Bay Step 2  3.5in string blocks made (completed in 2012 )
....done...Orca Bay Step 3 2in HSTs (YTD 55 plus120 in 2012)  total 175
.....done..Orca Bay Step 4 5.5in string blocks (YTD 08 plus 24 of 32 in 2012) total 32
.....00.....Orca Bay Step 5 cut 350 triangles and stitch to part 3 (0 of 175)
.....00.....Orca Bay Step 6 cut 2.5in squares and assemble Ohio Stars (0)
..done.....Floribunda Blocks assembled into flimsy and ready to quilt!
..............Talkin Turkey..... 2 blocks complete plus parts
..............Midnight Flight....1 block complete plus parts
..............Winston Ways... 2 blocks complete plus parts
..............Easy Street Steps 1-8 Completed in 2012
...done...Easy Street  inner border cut and attached
............. Easy Street  2nd border: square in square blocks  (108 of 116 YTD
............. Easy Street final purple border

Friday, June 7, 2013

Floribunda

Last year, with Bonnie's permission, I cut kits and stitched up a couple of quilt blocks using her pattern, Floribunda, to offer as a class for  FCE Craft day.  The extra kits and fabric I have been using as one of several leader/ender projects.  I finally have 20 blocks complete and assembled the quilt several weekends ago... I've just been too busy to get around to posting this.  Unfortunately, I didn't refer back to the pattern before assembling and I slanted all the blocks in the same direction instead of alternating to make an "X".  Oh well,  it's done and I like it anyway!





Now I must find fabric for a backing. 




Wednesday, May 22, 2013

Quilting at the Barn



It's been about a month since I drove up to Clarkrange to Becky's Barn for a "Sweet & Sassy" class by designer JP Anderson.   Life sort of happened and posting has been delayed. 

http://beckysbarn.blogspot.com/2013/04/busy-beebs-quilting-beckys-barn-present.html

I forgot to bring my camera, but if you visit Becky's blog, I am sure she will have additional pictures up soon.


She made crockpot full of chili and a chicken casserole for our lunch break.  Delicious!

Here are some pictures of my project...  

I cut fabric strips from a plaid shirt and some lavender Kona Cotton I had in my stash that never got used for another project, and using the Sweet' N Sassy Templates by Creative grids I made the rhombus 4 patches. 



 The sashing and setting triangles were also cut from some Kona Cotton.



I wasn't too sure about my color choice for the setting triangles....

 
until I found this fabric for the borders and backing in Becky's shop!  Perfect!  It brings together all the colors from the shirting.

Thanks Becky and JP for a great day!

Monday, May 20, 2013

More Water Troubles


Two ago, we were forced to replace the waterline from the road to the house.  A very high meter reading told us we had a leak, but we had no visible signs of water anywhere!  Turns out, the leak was under the concrete slab and the water was draining into the ground under the house.    We located a plumber who dug up the front lawn and ran a new line and connection into the house, capping off the old line. Thankfully, that took care of the problem and our water bills went back to normal.

Three weeks ago I was out mowing the front lawn and and stepped into a big mushy puddle out near the meter.  UGH!  I called the water department, and sure enough, there was a leak... this time on the City's side of the meter and they would make the repair at no cost to us.  Since then, we have had day after day after day of rain until, finally, it was dry enough today for them to do the work.


Imagine my surprise when I returned from walking Toby to find them digging a hole across the street!  Turns out, the leak was under the road somewhere and they had to replace the section that runs under the road between my house and the neighbors.






They eventually got around to digging up my front lawn also.






They tied a rope and the new line to the broken line and used the digging shovel to pull the new line under the road and up on our side.


 
When they had everything hooked up and running again, they did "repair" my front lawn... but i fear it will never be the same again!



Thursday, May 9, 2013

A new life

jaxson clay kulis

born may 9 2013

7 lbs 1.1 oz

19.75 in 

all are doing well



It's Time!



As this posts, we are heading to the hospital go get things started!



I completed the last stitches on the Big Brother and New Baby quilts.... just in time!



 

Big Brother loves to carry around his receiving blankets. And I have to tuck several of them around him when he sleeps over... So I used my AccuQuilt Studio Cutter and cut them up and re-stitched them with some additional flannels into one bigger blanket... easier for tucking!



For the new baby, I chose this sweet farm animal print.  Mom couldn't give me a color scheme, but I thought these "neutral" colors would match most anything she chose.

Monday, May 6, 2013

Birthday Boy's Hero



Last week was my grandson's fourth birthday.  

In December, his aunt (my youngest daughter) decided she wanted to learn decorative cake baking... 


We all think she did a wonderful job!



Last year it was Scooby Doo... 

this year Sponge Bob... 
I wonder who his hero will be next year!

Friday, May 3, 2013

I'm a Winner!

I opened up my email this morning to find this:

Congratulations, HelenMarie! You're a winner of a copy of 100 Blocks! Would you please send me your address so I can get it in the mail to you? Thank you!

- Elizabeth
Elizabeth Dackson
dontcallmebetsy.com
 
Thank you Elizabeth! I can't wait for my copy to arrive!

Be sure to go over to Quiltmaker.com and join the blog hop, visit and comment on the partipating blogs for your chance to win a variety of prizes!
 You may get lucky... like me!

Thursday, May 2, 2013

Totals 2013 - April

Another busy month has gone by and progress has been made on several UFO projects.  I completed two more of my quilts this month... Baltimore Album and Civil  War Snowball, and the Hope Academy Banner is done and currently hanging in the church.

I made progress on my Orca Bay (needing to cut fabric for 42 more hourglass blocks) and Florabunda quilts (all parts are cut and complete... now to stitch them all together!  I cut fabric for the remaining SIS blocks for my Easy Street pieced border and I was thrilled to locate another 3 yards of the purple fabric for my final border.

And, silly me... I started another new project! My monthly wednesday sewing group decided to make a Spring wall hanging together.  I've almost completed the background and will begin preparing the applique flowers this weekend.

 WORK COMPLETED IN APRIL
.....08.....customer tops quilted (YTD 23)
.....02.....customer quilts bound (YTD  08)
.....00.....flimsy completed waiting for quilting ( 4 )
.....03.....quilted flimsy (YTD 9 )
......15..hand-work hours (62 YTD )

MY PROJECTS COMPLETED THIS YEAR:
Lucky Charms wall hanging (1/21/13)
Basket Sampler Welcome wall hanging (2/15/13)
Knitted afghan  (3/20/13)
Scrap Mania quilt (3/19/13)
Orange/Blue Jelly Roll quilt (3/18/13)
Hope Academy Banner (3/27/13)
New Baby quilt (3/22/13)
Baltimore Album (4/5/13)
Civil War Snowball (4/5/13)

        Bonnie Projects
.....00.....cheddar bowties blocks hand-pieced YTD  0 ...  81 of 162 in 2012)
.....00.....cheddar bowtie rows stitched (YTD  0 .... 9 of 18 in 2012)
.....49.....Orca Bay Step 1 hourglass blocks made (YTD 49  plus 21 in 2012) total  70 of 112 )
....done.....Orca Bay Step 2  3.5in string blocks made (completed in 2012 )
....done.....Orca Bay Step 3 2in HSTs (YTD 55 plus120 in 2012)  total 175
.....done....Orca Bay Step 4 5.5in string blocks (YTD 08 plus 24 of 32 in 2012) total 32
.....00.....Orca Bay Step 5 cut 350 triangles and stitch to part 3 (0 of 175)
.....00.....Orca Bay Step 6 cut 2.5in squares and assemble Ohio Stars (0)
.....01.....Floribunda Blocks (13 YTD).... with parts completed to assemble 7 more blocks
..............Talkin Turkey..... 2 blocks complete plus parts
..............Midnight Flight....1 block complete plus parts
..............Winston Ways... 2 blocks complete plus parts
..............Easy Street Steps 1-8 Completed in 2012
.....00.....Easy Street  inner border cut and attached
.....32.... Easy Street  2nd border: square in square blocks  (108 of 116 YTD
............. Easy Street final purple border

Tuesday, April 30, 2013

Going home

I can't believe it's been almost a month since I last posted.  But life has been hectic, so that does make sense.

Let's see, what I've been doing...

First, a trip to Maryland to visit  family and the place my husband grew up. We didn't get up north for Christmas because of the flu.  Unfortunately, his parents were dealing with various health issues and spending too much time in the ER... we weren't able to vist with them for very long, but did spend the day with his siblings and enjoyed a nice dinner together.

From there we went "home" to Winchester VA.  Hubby spent several days at the plant sorting through files and product samples, deciding what was to be disposed of and what should be kept for product historical reference.  The plant is now officially closed, but he needs to go back again and finish the job .  

While he did that, we went and visited the old homestead.  The new owners have made quite a few changes over the last 10 years... most notably... building a detached  "3 car garage" on top of what was our vegetable garden!  Yes, it was a garage/storage space accessed via the driveway around the back of the house, but it's main purpose was the street level living quarters for his mother.  They added access to her appartment with a porch on the front side.  So basically they built a second house 20 feet from the main house!  I can't believe the HOA allowed it!  I should have grabbed my camera and taken pictures, but I was so shocked I didn't think of it!  Gone were all of the beautiful flower gardens we had worked so hard to cultivate.  The pond is now overrun with cattails and needs a lot of work.

I spent the remaining time at the local Discovery Museum.  White House applesauce is grown and packaged locally and they sponsored the museum which included an area mimmicking a factory.  The grandson had a blast using the various pulley systems to move the apples from the tree through the factory.

  
And no trip north would be complete with out a drive over to Federick for some steamed Maryland Crabs!  Banging crab claws with the little wooden hammer was his favorite part!... he even ate some!



Thursday, April 4, 2013

Another Aquisition and UFO Progress


I was recently volunteering at the local Habitat ReStore, helping my daughter earn sweat equity hours.  On a shelf, in the back, I spied this serger on a top shelf.  I have never used one, but I understand they are great for finishing the edges of a quilt before binding.  So, I asked about it.  It had not been plugged in or tested, but if I wanted it, I could take it home, as is, for $10.  I turned the flywheel (is that what it's called?) a few times and it appeared to be stitching the newspaper (rolling eyes here) so it came home with me.  With all the tops I plan on completing this year, I think that she will be a nice addition to my machine collection.

In January, I had several projects that were near completion... just needing borders or a bit more hand stitching.  There were several others that were just waiting their turn on the quilter.   Pat Sloan is blogging monthly tips and ideas on how to move projects along, so I have jumped on the bandwagon too.

First, I made a list ... a long list... of all the projects I have on hand in various stages of completion. 

Then I decided to make some progress... starting with actually quilting some of the tops I had already completed.  When not taking care of family and activities, I spend most of my time quilting for customers or making donations or gifts... not quilting something for me.  So, my UFO busting plan is to get my tops out of topville this year!




In January, I completed Lucky Charms... a free pattern by Pat Sloan.  It is now hanging in my living room.    



 



In February, I completed my Welcome Basket Sampler... my modified version of another design Pat Sloan. I started this in a class with Pat back in 2010.  It hung as a flimsy on my wall last fall.  Now it is ready for hanging this fall.  This wall hanging won a blue ribbon at the district women's club competition and is currently on its way to Nashville for state level competition! 





In March, I completed a jelly roll quilt, my ScrapMania Thangles quilt, and a baby quilt for my soon to be born grandson (oops need to get a picture of that one!) My proudest completion this year is the wall banner for my son's class.  I blogged about it earlier; I started working with the "kids" individually in September, helping them choose a shape, fuse it and blanket stitch it to the background.  I was able to complete the final construction in time to hang for Easter celebrations at the church.


Now it's April and next up is my Baltimore Album quilt.  I purchased this quilt kit from my LQS several years ago and then just got busy and never got it made.  Last year I assembled the quilt and this year it will be completed.  It is the first one that my husband actually said he liked... without any prompting from me!  Definitely a keeper!  It is currently on the quilter and I hope to have it ready to bind this weeken. 


Monday, April 1, 2013

2013 Totals - March

Oh my goodness!  Where did the month go?!?!

I finished my handwork projects for March and won first place awards for the knitting and wall hanging!  They move on to the women's club state competition April 6.

I also completed and delivered my son's classroom banner.  Everyone was thrilled to see this project come together!  We will do a formal presentation to the pastor mid-April and it will hang in the church for a couple weeks for all the parishioners to see before it finds a permanent place in the classroom!

 
 WORK COMPLETED IN MARCH
.....05.....customer tops quilted (YTD 23)
.....02.....customer quilts bound (YTD  06)
.....00.....flimsy completed waiting for quilting ( 4 )
.....03.....quilted flimsy (YTD 5 )
.....27......hand-work hours (47 YTD )

MY PROJECTS COMPLETED THIS YEAR:
Lucky Charms wall hanging (1/21/13)
Basket Sampler Welcome wall hanging (2/15/13)
Knitted afghan  (3/20/13)
Scrap Mania quilt (3/19/13)
Orange/Blue Jelly Roll quilt (3/18/13)
Hope Academy Banner (3/27/13)
New Baby quilt (3/22/13)

        Bonnie Projects
.....00.....cheddar bowties blocks hand-pieced YTD  0 ...  81 of 162 in 2012)
.....00.....cheddar bowtie rows stitched (YTD  0 .... 9 of 18 in 2012)
.....00.....Orca Bay Step 1 hourglass blocks made (YTD 0 .. 21of 112 in 2012)
....done.....Orca Bay Step 2  3.5in string blocks made (completed in 2012 )
....done.....Orca Bay Step 3 2in HSTs (YTD 50    ....120 of 175 in 2012)
.....done....Orca Bay Step 4 5.5in string blocks (YTD 08....24 of 32 in 2012)
.....00.....Orca Bay Step 5 cut 350 triangles and stitch to part 3 (0 of 175)
.....00.....Orca Bay Step 6 cut 2.5in squares and assemble Ohio Stars (0)
.....00.....Floribunda Blocks (12 YTD).... with parts completed to assemble more blocks
..............Talkin Turkey..... 2 blocks complete plus parts
..............Midnight Flight....1 block complete plus parts
..............Winston Ways... 2 blocks complete plus parts
..............Easy Street Steps 1-8 Completed in 2012
.....00.....Easy Street  inner border cut and attached
.....00.... Easy Street  2nd border: square in square blocks  (72 of 116 YTD
............. Easy Street final purple border

Wednesday, March 27, 2013

Hope Academy Banner

It's finally complete!

I put the last stitches in and delivered the banner to class this morning!  Everyone is thrilled with the results!  and we have been asked to make a "formal" presentation to the church pastor during services after Easter.  It will be hung somewhere in the church as a reminder to parishioners of how much good their donations are doing!

 

Friday, March 22, 2013

New Legs

When I bought my new Nolting Funquilter back in 2010, in order cut expenses, I  purchased a perfectly good used table to mount it on. 



These old legs were leveled and height adjusted using that bolt and sliding up and down the slot.  There are no grooves to lock into to match all 4 legs to the same height.  Yes, we did  measure and draw our own lines to help.  The nut/bolt has to be loosened, slid up or down, and then tightened with no weight.  The problem is when the weight is put back on the leg even when tightened, can slip down a bit, especially over time...and not necessarily evenly slipping on all four legs!  Recognizing this, Nolting has made a few design changes and since Mike and/or his son Steve were going to be in the area (as in TN not GA or OH) this weekend they ordered the new style leveling legs for me.

The package arrived and Steve made the 2 hour drive from Marysville to do the install for me.

The problem.... the wrong legs were ordered/sent.  I need to have wheels on my legs so that I can move the frame to and from the wall depending on which side of the machine I am working on.  Unfortunately, my working space isn't big enough to center the machine in the room to be able walk around it, which is the more common set-up. 

So after some discussion and thought I made a mad dash to Lowes before they closed and purchased "moving men".  Those slider things that you put under furniture to make it easier to move heavy items around the room. 

So my new legs are now installed.  The machine is much more level (no rolling front to back or left to right when I let go!  I am much happier!  

The legs adjust height by just turning the legs left or right on those screw-grooved pegs.   I may still have to order the wheeled legs to give me just a bit more height, but I'll decide after working on her a bit. If I am working "half-cocked" or slightly bent forward it puts strain on my lower back and, well, ouch!   I'll be loading a practice quilt today and giving the new legs a try.  




Wednesday, March 20, 2013

Monsoon Monday!



After all that beautiful weather this weekend, Monday brought lots of rain!

The ditch across the front lawn from the water line repair was settling down and filling with water.

I sent Matthew out to rake the dirt into the ditch and hopefully level things off a bit more.

 

Tuesday, March 19, 2013

Saturday in the park...



It was a warm and gorgeous Saturday and we had the grandson again while Mom worked.  So after a vegetable finding trip to the farmers market and a quick lunch, it was off to the park.....


                                      feeding the ducks and geese in the lake


climbing up the monkey bars and down the slides!

 

Monday, March 18, 2013

Rummage Sale

Minimal sewing was accomplished last week. 

Instead, I was busy with our annual church rummage sale. Monday through Friday, we accept donations.  Several parishioners and members of the Daughters of Isabella worked together sorting, folding, arranging, and pricing all week long.  The doors close at noon on Friday.





Then the fun begins at 4pm when we open the doors to crowds waiting to get in and find a good deal!

There were plenty of deals to be had...



computer monitors, keyboards, printers 
golf clubs, balls, catchers mitt and protective gear
Christmas ornaments and decorations of all kinds
Kitchen gadgets, glassware, dishes, pots & pans
and lots and lots of clothing!  Tables full!



This year, we even had a mink coat!

This was another very successful event, raising some $2700 to fund various charitable activities of the parish.