When I bought my new Nolting Funquilter back in 2010, in order cut expenses, I purchased a perfectly good used table to mount it on.
These old legs were leveled and height adjusted using that bolt and sliding up and down the slot. There are no grooves to lock into to match all 4 legs to the same height. Yes, we did measure and draw our own lines to help. The nut/bolt has to be loosened, slid up or down, and then tightened with no weight. The problem is when the weight is put back on the leg even when tightened, can slip down a bit, especially over time...and not necessarily evenly slipping on all four legs! Recognizing this, Nolting has made a few design changes and since Mike and/or his son Steve were going to be in the area (as in TN not GA or OH) this weekend they ordered the new style leveling legs for me.
The package arrived and Steve made the 2 hour drive from Marysville to do the install for me.
The problem.... the wrong legs were ordered/sent. I need to have wheels on my legs so that I can move the frame to and from the wall depending on which side of the machine I am working on. Unfortunately, my working space isn't big enough to center the machine in the room to be able walk around it, which is the more common set-up.
So after some discussion and thought I made a mad dash to Lowes before they closed and purchased "moving men". Those slider things that you put under furniture to make it easier to move heavy items around the room.
So my new legs are now installed. The machine is much more level (no rolling front to back or left to right when I let go! I am much happier!
The legs adjust height by just turning the legs left or right on those screw-grooved pegs. I may still have to order the wheeled legs to give me just a bit more height, but I'll decide after working on her a bit. If I am working "half-cocked" or slightly bent forward it puts strain on my lower back and, well, ouch! I'll be loading a practice quilt today and giving the new legs a try.
Friday, March 22, 2013
Wednesday, March 20, 2013
Monsoon Monday!
After all that beautiful weather this weekend, Monday brought lots of rain!
The ditch across the front lawn from the water line repair was settling down and filling with water.
I sent Matthew out to rake the dirt into the ditch and hopefully level things off a bit more.
Tuesday, March 19, 2013
Saturday in the park...
It was a warm and gorgeous Saturday and we had the grandson again while Mom worked. So after a vegetable finding trip to the farmers market and a quick lunch, it was off to the park.....
feeding the ducks and geese in the lake
climbing up the monkey bars and down the slides!
Monday, March 18, 2013
Rummage Sale
Minimal sewing was accomplished last week.
Instead, I was busy with our annual church rummage sale. Monday through Friday, we accept donations. Several parishioners and members of the Daughters of Isabella worked together sorting, folding, arranging, and pricing all week long. The doors close at noon on Friday.
Then the fun begins at 4pm when we open the doors to crowds waiting to get in and find a good deal!
There were plenty of deals to be had...
computer monitors, keyboards, printers
golf clubs, balls, catchers mitt and protective gear
Christmas ornaments and decorations of all kinds
Kitchen gadgets, glassware, dishes, pots & pans
and lots and lots of clothing! Tables full!
This year, we even had a mink coat!
This was another very successful event, raising some $2700 to fund various charitable activities of the parish.
Instead, I was busy with our annual church rummage sale. Monday through Friday, we accept donations. Several parishioners and members of the Daughters of Isabella worked together sorting, folding, arranging, and pricing all week long. The doors close at noon on Friday.
Then the fun begins at 4pm when we open the doors to crowds waiting to get in and find a good deal!
There were plenty of deals to be had...
computer monitors, keyboards, printers
golf clubs, balls, catchers mitt and protective gear
Christmas ornaments and decorations of all kinds
Kitchen gadgets, glassware, dishes, pots & pans
and lots and lots of clothing! Tables full!
This year, we even had a mink coat!
This was another very successful event, raising some $2700 to fund various charitable activities of the parish.
Friday, March 15, 2013
Habitat Update
I am amazed at how quickly the visiting college students, with help from some local contractors, are assembling the house.
Two weeks ago, local contractors started with pouring the concrete base for the foundation and laying all but the last 3 rows of brick.
Last week, inspite of the snowy and rainy weather, the foundation was finished and 20 college students from Iowa were able to assemble the flooring
Two weeks ago, local contractors started with pouring the concrete base for the foundation and laying all but the last 3 rows of brick.
Last week, inspite of the snowy and rainy weather, the foundation was finished and 20 college students from Iowa were able to assemble the flooring
This week, 12 students from Indiana have raised the walls and the roof!
The front and side windows installed too!
Today, the contractors put most of the shingles on the roof
Next week, students from Pennsylvania are scheduled to finish installing the windows and doors and install the siding! Electrical, plumbing and insulation contractors are scheduled too. I am totally amazed at how quickly this is coming together!
Thursday, March 14, 2013
Water troubles
Last Thursday, the city came around and read the meters (gas, electric, water) as usual. Some time on Friday a supervisor came by and re-read the meters. I came home late afternoon to find a "lovely" red tag on my doorknob informing me of high water usage... more than double our normal use! UGH!
There was no water running in the house... and yet the meter was spinning away! I turned the shutoff valve in the basement... and still the meter was spinning! That meant there was a leak somewhere between the meter and my house. Since there were no puddles in the yard, best guess is that the leak was under the concrete slab the house was built on. I opened the phonebook and was able to get two repair quotes before dark(one extremely high and the other comparably quite low) and the advice to call the 811 number and have all utility lines marked so work could start ASAP. I waited for a third quote by a plumber highly recommended by one of the girls in my church group.
Scott learned his trade working with his dad, and took over his dad's business when he retired. He is licensed and insured and a pleasure to work with!
First, the outside work. Start with some hand digging near the house to avoid the gas line.
Then pull out the trencher to dig across the yard and down 18in (below the frost line) to bury the new water line.
There was no water running in the house... and yet the meter was spinning away! I turned the shutoff valve in the basement... and still the meter was spinning! That meant there was a leak somewhere between the meter and my house. Since there were no puddles in the yard, best guess is that the leak was under the concrete slab the house was built on. I opened the phonebook and was able to get two repair quotes before dark(one extremely high and the other comparably quite low) and the advice to call the 811 number and have all utility lines marked so work could start ASAP. I waited for a third quote by a plumber highly recommended by one of the girls in my church group.
Scott learned his trade working with his dad, and took over his dad's business when he retired. He is licensed and insured and a pleasure to work with!
First, the outside work. Start with some hand digging near the house to avoid the gas line.
![]() |
![]() |
![]() |
| new line running under gas line into house |
Next, inside he capped off and removed the old incoming pipes and filter from under the bench in the center of the house in my quilting room
and hooked into the lines near the front of the house and installed a more easily accessable filter in my sewing room closet.
I'll just get a small tension rod and make a curtain to hide this rather than installing a wall with access door in the side of my closet.
Mission accomplished! and the meter is no longer spinning like a top!
Wednesday, March 6, 2013
March
You know that old saying.... in like a lion out like a lamb
Well, we are having our lion...the dreaded four-letter word fell here in TN last night...SNOW!
You know the stuff... where all you have to do is hint at the "S" word and everyone in town runs to Walmart for TP, milk and bread! Even when we lived in VA, just mentioning the "S" word or seeing one flake could start a panic run. Schools would be delayed or even closed the night before the first flake fell! Coming from New York, I never understood it... still don't. I know, we don't have massive amounts of removal/salting equipment here. The school buses have all those hills and hollers to drive. But we don't have massive amounts of snow here either.. and for the most part... the roads are usually melted clear before lunchtime.
We had maybe an inch last night... and it's sticking only on the grass! The roads might be a little slick until it warms up in a couple hours... you just have to drive carefully. Schools are closed here for Spring Break so no panic here, but all across middle TN they are closed due to inclement weather.
I haven't gotten any quilting done this week. Our church rummage sale is Friday so we have been busy taking donations, sorting and pricing. The rainy weather yesterday gave us time to catch up with all the donations. The snow today will probably mean a slow day too. The nicer weather on Thursday and Friday should, hopefully, pack our tables full. (I'll get some pictures today tp [post later)
Construction on my daughter's home began Friday with digging and pouring the foundation. Monday and Tuesday had the contractor laying the bricks. Today, the college kids arrive and the plan is to lay the flooring.
I will stop by later today to document the progress.
***UPDATE***
I was incorrect... the foundation needs about three more rows of blocks added. Hopefully that will get done tomorrow. The footers also have to be constructed. The college kids are heading into Nashville tomorrow to see the sights (they are from PA, IA and IN) They will be back and ready to work hard on Friday!
Well, we are having our lion...the dreaded four-letter word fell here in TN last night...SNOW!
You know the stuff... where all you have to do is hint at the "S" word and everyone in town runs to Walmart for TP, milk and bread! Even when we lived in VA, just mentioning the "S" word or seeing one flake could start a panic run. Schools would be delayed or even closed the night before the first flake fell! Coming from New York, I never understood it... still don't. I know, we don't have massive amounts of removal/salting equipment here. The school buses have all those hills and hollers to drive. But we don't have massive amounts of snow here either.. and for the most part... the roads are usually melted clear before lunchtime.
We had maybe an inch last night... and it's sticking only on the grass! The roads might be a little slick until it warms up in a couple hours... you just have to drive carefully. Schools are closed here for Spring Break so no panic here, but all across middle TN they are closed due to inclement weather.
I haven't gotten any quilting done this week. Our church rummage sale is Friday so we have been busy taking donations, sorting and pricing. The rainy weather yesterday gave us time to catch up with all the donations. The snow today will probably mean a slow day too. The nicer weather on Thursday and Friday should, hopefully, pack our tables full. (I'll get some pictures today tp [post later)
Construction on my daughter's home began Friday with digging and pouring the foundation. Monday and Tuesday had the contractor laying the bricks. Today, the college kids arrive and the plan is to lay the flooring.
![]() |
| I think this foundation is complete. Flooring is next. |
![]() | |
| supplies for the flooring |
I will stop by later today to document the progress.
***UPDATE***
I was incorrect... the foundation needs about three more rows of blocks added. Hopefully that will get done tomorrow. The footers also have to be constructed. The college kids are heading into Nashville tomorrow to see the sights (they are from PA, IA and IN) They will be back and ready to work hard on Friday!
![]() | |
| I think this group is from IA |
![]() | |
| making saw horses to be used at various build sites |
![]() |
| roof trusses for backyard shed |
![]() | |
| Not sure what these are for. Someone suggested they might be shelving for the Habitat building |
Thursday, February 28, 2013
Totals 2013 February
I have had a busy month, trying to move forward on several UFOs and prepare some projects for entry at the fair, FCE and Junior Womens Club upcoming cultural arts programs.
Handwork:
Three years ago I bought this gorgeous teal yarn and found a pattern I liked ("King Charles Brocade") and began knitting this afghan. There is a lot of counting of knits and pearls for each row so I could only work on this with full concentration.... that is why it has taken me so long to complete. I am finally finished and it is ready to enter.
I also finished blanket-stitching the fusible wording on my basket sampler wall hanging and it now quilted and ready to hang.
Machine Sewing:
Last fall I began working with my son's group making applique quilt blocks for a banner to hang in the activity room where they meet. With only two blocks remaining to be complete I began arranging blocks an deciding on a layout.

The inner border is now attached, and I am making progress on the borders for Easy Street. I've stitched together 2 borders worth of blocks and half done with a 3rd border. These little 3" finished blocks are so cute and I'm looking forward to a finished flimsy!
Lastly, this month I've finally set these pieced and applique blocks into a wall hanging. I still have to add the wide muslin border with some more applique and then a final pieced border. Still a long way to go, but I'm making progress.
WORK COMPLETED IN FEBRUARY
.....07.....customer tops quilted (YTD 1)
.....03.....customer quilts bound (YTD 05)
.....01.....flimsy completed waiting to be quilted (YTD 2) Lucky Charms, Basket Sampler
.....01.....quilted flimsy (YTD 2) Lucky Charms, Basket Sampler
.....20......hand-work hours (20 YTD )
Bonnie Projects
.....00.....cheddar bowties blocks hand-pieced YTD 0 ... 81 of 162 in 2012)
.....00.....cheddar bowtie rows stitched (YTD 0 .... 9 of 18 in 2012)
.....00.....Orca Bay Step 1 hourglass blocks made (YTD 0 .. 21of 112 in 2012)
.....00.....Orca Bay Step 2 3.5in string blocks made (completed in 2012 )
.....00.....Orca Bay Step 3 2in HSTs (YTD 0 ....120 of 175 in 2012)
.....08....Orca Bay Step 4 5.5in string blocks (YTD 08....24 of 32 in 2012)
.....00.....Orca Bay Step 5 cut 350 triangles and stitch to part 3 (0 of 175)
.....00.....Orca Bay Step 6 cut 2.5in squares and assemble Ohio Stars (0)
.....00.....Floribunda Blocks (12 YTD).... with parts completed to assemble more blocks
..............Talkin Turkey..... 2 blocks complete plus parts
..............Midnight Flight....1 block complete plus parts
..............Winston Ways... 2 blocks complete plus parts
..............Easy Street Steps 1-7 Completed in 2012
..............Easy Street Step 8 Block A (16 of 16)
.....................Block B ( YD 9 of 9)
....01...... Easy Street 1.5 in inner border cut and sewn
.....72.... Easy Street square in square blocks (72 of 116 YTD
............. Easy Street final purple border
Handwork:
Three years ago I bought this gorgeous teal yarn and found a pattern I liked ("King Charles Brocade") and began knitting this afghan. There is a lot of counting of knits and pearls for each row so I could only work on this with full concentration.... that is why it has taken me so long to complete. I am finally finished and it is ready to enter.
I also finished blanket-stitching the fusible wording on my basket sampler wall hanging and it now quilted and ready to hang.
Machine Sewing:
Last fall I began working with my son's group making applique quilt blocks for a banner to hang in the activity room where they meet. With only two blocks remaining to be complete I began arranging blocks an deciding on a layout.

The inner border is now attached, and I am making progress on the borders for Easy Street. I've stitched together 2 borders worth of blocks and half done with a 3rd border. These little 3" finished blocks are so cute and I'm looking forward to a finished flimsy!
Lastly, this month I've finally set these pieced and applique blocks into a wall hanging. I still have to add the wide muslin border with some more applique and then a final pieced border. Still a long way to go, but I'm making progress.
WORK COMPLETED IN FEBRUARY
.....07.....customer tops quilted (YTD 1)
.....03.....customer quilts bound (YTD 05)
.....01.....flimsy completed waiting to be quilted (YTD 2) Lucky Charms, Basket Sampler
.....01.....quilted flimsy (YTD 2) Lucky Charms, Basket Sampler
.....20......hand-work hours (20 YTD )
Bonnie Projects
.....00.....cheddar bowties blocks hand-pieced YTD 0 ... 81 of 162 in 2012)
.....00.....cheddar bowtie rows stitched (YTD 0 .... 9 of 18 in 2012)
.....00.....Orca Bay Step 1 hourglass blocks made (YTD 0 .. 21of 112 in 2012)
.....00.....Orca Bay Step 2 3.5in string blocks made (completed in 2012 )
.....00.....Orca Bay Step 3 2in HSTs (YTD 0 ....120 of 175 in 2012)
.....08....Orca Bay Step 4 5.5in string blocks (YTD 08....24 of 32 in 2012)
.....00.....Orca Bay Step 5 cut 350 triangles and stitch to part 3 (0 of 175)
.....00.....Orca Bay Step 6 cut 2.5in squares and assemble Ohio Stars (0)
.....00.....Floribunda Blocks (12 YTD).... with parts completed to assemble more blocks
..............Talkin Turkey..... 2 blocks complete plus parts
..............Midnight Flight....1 block complete plus parts
..............Winston Ways... 2 blocks complete plus parts
..............Easy Street Steps 1-7 Completed in 2012
..............Easy Street Step 8 Block A (16 of 16)
.....................Block B ( YD 9 of 9)
....01...... Easy Street 1.5 in inner border cut and sewn
.....72.... Easy Street square in square blocks (72 of 116 YTD
............. Easy Street final purple border
Wednesday, February 27, 2013
Treadling
Last night I was watching Bonnie treadling away on Quiltcam and she was talking about her "Red Eye". I have recently re-organized/arranged my sewing room (again!) and un-burried my treadle.
I was yard sale shopping a few years ago and picked up this gorgeous Singer "Redeye". The grandmother I bought it from had sewn on it "for ages" but age and health problems left her unable to continue to do so. Sadly, none of her children or grandchildren were interested in acquiring it or learning to sew.... That has worked out just fine for me!
The serial number G8546689 indicates that it was made in 1921.... a A Singer 66.
Looking on the internet I have found the decal pattern may originally have been called "Scroll (red)". But the common names for it are "Red Head" or "Red Eye" due to the red eye-shaped design in the decal decoration.
It is in excellent shape for a 92 year old! They sure don't build them like this anymore!
It is in excellent shape for a 92 year old! They sure don't build them like this anymore!
The Singer 66 sewing machine produces a near perfect stitch. When
sewing well the 66 will out-sew nearly any modern machine through a huge
variety of fabrics from linen to lace, horse blankets to buckram. It is
simply near perfect engineering but this came at a price. A Singer 66
was one of the most expensive sewing machines on the market costing
several months wages. Most sewers would opt for the
smaller twin, the Singer 99, but for those professional sewers who wanted
more foot clearance and space the Singer 66 was the queen. Expensive but
simply the best.
The 66 arrived after nearly half
a century of improvements and developments.The mass produced machine
was introduced around 1900 and used the smooth oscillating hook. The
hook mounted horizontally allowed the bobbin to be simply dropped into
the machine. The simplicity of threading and perfection of stitch made
the 66 an instant best seller. The high-arm clearance and sewing ability
was second to none.
It ran from the 1900 right up
until the model was superseded by the amazing Singer 201 in
1939. The Singer 201 was possibly the finest Singer ever produced. The
smaller stable-mate to the Singer 66 was the Singer 99 identical except
for size.
The British Singer 66's were
adorned with three different decals. Firstly the Lotus petal; then came the Sphinx which was also used on the Singer 15k and a
few other shuttle models. In America
the red-eye pattern stayed with the machine whereas in Britain the
Singer 66 had three decal changes.
The Singer "Red Eye" gets its name from the beautiful lenticular design
used throughout its decoration. Several other machines earn names from
their embellishments such as the Sphinx, Lotus, Memphis, Egyptian, etc.
Bonnie suggested starting with string blocks when learning to treadle... no need for perfect 1/4 inch seams....that is exactly what I plan to do. I have a bag of gifted strings that need to be sewn!
I'll need to research how to oil and clean her up a bit first; but hope to be ready to sew on her by the time Bonnie returns for the next Quiltcam.
Bonnie suggested starting with string blocks when learning to treadle... no need for perfect 1/4 inch seams....that is exactly what I plan to do. I have a bag of gifted strings that need to be sewn!
I'll need to research how to oil and clean her up a bit first; but hope to be ready to sew on her by the time Bonnie returns for the next Quiltcam.
Thursday, February 21, 2013
Wednesday Sewing Sisters
Since many of us a guild members (some do attend the night meetings) we do share guild information, but we decided not to be a "guild" meeting with a specific agenda or project to work on. Everyone brings whatever project they are working on and we sit and chat and sew.
![]() |
| Judy was frogging the ditch stiching she did last month |
![]() |
| Peggy was pinning her cancer ribbon getting ready to quilt |
![]() | ||||
| Merry was handpiecing her apple cores |
I stitched the inner border onto my Easy Street top. It was nice having lots of space and bigger tables to work .
I also finished stitching this little wall hanging I began in a class at Becky's Quilt Barn last September.... you can read about it here:
http://www.blogger.com/blogger.g?blogID=4545104586551376905#editor/target=post;postID=8659972040860552852
I returned home from class and got busy and it has been patiently waiting for me to decide how to complete it. The problem is that it is too small for my wall and I don't have enough of that blue to make it bigger. After consulting with the girls today, I have decided to add a wide muslin border and applique some flowers and or baskets and make a final scrappy border to finish this out.
It was a fun morning and I look forward to our next meeting.
Subscribe to:
Posts (Atom)















































